-
As part of the Danube expansion between Straubing and Vilshofen, the harbour basin in Straubing-Sand harbour was deepened. Our specialised civil engineering team was responsible for the anchoring…
-
Participation in the "Münchner Geschenkeregen" donation campaign
Our corporate values of "shoulder to shoulder" and "passion" are not only evident in the realisation of our projects, on our…
-
The Salzbachtal bridge in Wiesbaden, a 304 m long, four-lane motorway bridge on the A66, had to be demolished and rebuilt within a tight time frame due to the disproportionate increase in heavy…
-
4 December is St Barbara's Day. On this day, miners and tunnellers commemorate their patron saint, Saint Barbara, and stop work for a moment. So do our tunnelling experts in the "Lahntalbahn tunnel…
-
On 3 December, the town of Voerde witnessed an impressive spectacle: the cooling tower of the decommissioned coal-fired power plant was brought down in a controlled demolition. It had an impressive…
-
At the age of 21, Isabel has already achieved a lot: after her first internship at PORR, her decision in favour of the construction industry was clear. That's why she completed her dual bachelor's…
-
231129 PORR press release PruefungHybrid FINAL en 231129 PORR press release PruefungHybrid FINAL en
THE INFORMATION CONTAINED IN THIS ANNOUNCEMENT IS NOT FOR PUBLICATION OR DISTRIBUTION, DIRECTLY OR…
-
Q3 result as a strong tailwind
Focus on optimising the balance sheet Targeted equity ratio of 20-25% Outlook for 2023 remains positive
As part of the optimisation of its equity structure, PORR…
-
231129 PORR press release PruefungHybrid FINAL en 231129 PORR press release PruefungHybrid FINAL en
THE INFORMATION CONTAINED IN THIS ANNOUNCEMENT IS NOT FOR PUBLICATION OR DISTRIBUTION, DIRECTLY…
-
Q3 result as a strong tailwind
Focus on optimising the balance sheet Targeted equity ratio of 20-25% Outlook for 2023 remains positive
Vienna, 29.11.2023 - As part of the optimisation of its…