Skip to content

Archive

2023

The soil mixing methode is a environmentally friendly and cost-effective construction pit systems.

The  benefits are:  ✅ Low carbon footprint: less cement ✅ Cost-effective: use of existing soil ✅ Lower transport & disposal costs: minimal extraction of soil On our construction site for a new apartment building at Lake Tegernsee, the client wanted an ecological and economical solution. The soil mixing method was ideally suited for these requirements.  Economical and safe - whatever the ground…

To Press release

PORR delivers strong preliminary figures for 2022 and confirms positive guidance

Order backlog climbs to EUR 8.2 bn Strong rise in production output (+8.7%) and revenue (+11.9%) Solid EBT margin in line with expectations Positive outlook for 2023 Vienna, 28.02.2023 – PORR’s initial performance and earnings indicators paint an excellent picture: PORR was able to make substantial gains in both production output and the order backlog. With an increase in the EBT margin…

To Press release

Stump-Franki obtains ISO 50001 certification

Energy management system introduced as part of the PORR Climate Strategy

To Press release

Career built by PORR: From holiday job to dual student

Yannic Bollwerk (20) got a taste of construction at PORR while still at school. Since then, his heart has beaten for construction: a dual study programme to become a civil engineer followed. He is currently in his third practical phase, which he is spending at Hochbau Nord in Hamburg. He does not regret his decision for a second and feels very much at home at PORR. The special thing: Yannic is a…

To Press release

Focus on customer trust: Marzipan Factory House 5, 6 and 8

Oevermann realises new construction of 3 office and commercial buildings Since 2011, a lot has been happening on the site of the former Oetker marzipan and confectionery factory in Hamburg-Othmarschen. An urban quarter with office and commercial space is being created here. Oevermann Hochbau is continuously and trustingly involved in this conversion alongside the client, HPV Marzipanfabrik GbR:…

To Press release

On schedule despite obstacles in the subsoil: Two excavation pits for plant for bulk loading of sugar

On behalf of Südzucker AG, the Munich-based Stump-Franki branch constructed two construction pits on the grounds of the Südzucker plant in Rain am Lech, including back-anchored bored pile walls, shotcrete nailing as well as dewatering and excavation. The construction work for the smaller excavation pit had to be completed before the peak of the annual sugar campaign. For this reason, reliability…

To Press release

Construction progress for the "An der Mole" neighbourhood on schedule

HOWOGE and PORR celebrate topping-out ceremony in Berlin

To Press release

Safe and on schedule: The construction of the Salzbachtal Bridge

Gap in the A66 near Wiesbaden 75% closed

To Press release

New career website of PORR in Germany is online

We make careers possible. Our ambition is to build a better world together. Who we are, what we do and why we do it is what we show with our new career website.

To Press release

Ecological and economical road rehabilitation in Bersenbrück

Use of concrete for roadbeds on county road 142

To Press release