Skip to content

Pile foundation for city harbour district, Berlin

Facts and Figures
Company PORR Spezialtiefbau GmbH
Principal Berlin’s city harbour district
Location Berlin - Germany
Type Foundations
Runtime 11.2016 - 05.2017

607 Atlas piles for Berlin’s city harbour district

The construction of the new city harbour district, Europacity, Berlin, is planned on a 40 ha plot of land in Heidestraße, north of Berlin’s main station, not far from the Spandau Ship Canal, designed to combine residential, gastronomy, retail and office spaces.

Between November 2016 and May 2017, PORR carried out three construction phases with full displacement piles, System Atlas, with a diameter of 46/56 cm and lengths of between 9 and 18 m for the new construction of 302 homes and six commercial units. The isg assisted with the development of the piles and the integrity measurements. The completion of the construction project is planned for the beginning of 2019.

Services:

607 Atlas piles,

ds/db = 46/56 cm,

Nd ≤ 2,670 / -905 kN

 

L ≤ 18 m