The ARGE PORR / Plauen Stahl Technologie GmbH (PST) was commissioned with the replacement construction of the Salzbachtal Bridge, a 304 m long, four-lane motorway bridge on the A66. The contract includes the construction of two steel composite bridges with six reinforced concrete piers and four abutments as well as a reinforced concrete bridge over the single-track Aarltal railway.
Follow the construction progress from blasting to completion.