Amtsgericht, Gütersloh

Facts and Figures
Company PORR Hochbau West GmbH
Principal Bau und Liegenschaftsbetrieb NRW
Location Gütersloh - Germany
Type Office buildings
Runtime 10.2024 - 04.2026
Architect/Planner ARGE Heitmann Pussert Kosch Architekten

PORR Hochbau West is taking over the construction work.

On behalf of Bau- und Liegenschaftsbetrieb NRW, PORR building construction is realising the construction of the new extension to the Gütersloh District Court. When construction begins, the four-storey new building will be connected to the listed old building from 1959 and will be aligned with the existing building in terms of size, storey height and colour of the façade. To ensure timely completion, the construction team is relying on LEAN management techniques.

Construction began in October 2024 on Friedrich-Ebert-Straße. The expansion to around 2,440 square meters will cover the increased space requirements of the court and the outpatient social services. At the same time, the project will consolidate previously scattered departments at a central location. Only minor conversion work is required in the existing building itself in the transition area. The architectural design of the new building, for which the ARGE Heitmann Pussert Kosch architects are responsible, is strongly influenced by the existing building. Particular attention is paid to barrier-free design.

The building construction team from Gütersloh is responsible for the construction work. Challenges such as the ongoing operation of the district court and the connection of the new building to the existing building require special measures – in particular with regard to sound insulation and maintaining access to the old building. Thanks to the use of LEAN management techniques, the project should be completed efficiently and within the given time frame: the load planner system is used to integrate an adapted phase as well as weekly planning. The close exchange between the local site manager and the subcontractor leads to short distances and short reaction times during the construction process. This minimizes construction delays.

In addition, the team relies on digital solutions for quality assurance: the PlanRadar defects software enables the digital and efficient processing of acceptance and defects. In combination with digital plan management, this ensures a resource-saving and structured construction process.