In 2017, SBEV Stadtbahn Europaviertel Projektbaugesellschaft mbH had commissioned Arge U5 Europaviertel, consisting of PORR Tunnelbau, PORR Ingenieurbau and Stump-Franki Spezialtiefbau, with the construction of the underground, 1,160 m long section - including the connection to the existing U5 line, the construction of an emergency exit at the connection point as well as the construction of a subway station in the course of the underground route.
The excursion was organized and carried out in cooperation with our client. On October 8, almost 40 people traveled from the construction site conference in Wiesbaden to Frankfurt to visit the pioneering construction site. The visitors were given a unique look at the impressive project and behind the scenes.